Food, Dairy & Beverage |
Sustainable sourcing, production and distribution for food, dairy and beverage producers. Practical decarbonization delivered by engineers, not general consultants. And with VSAg, verified Scope 3 data from the farms behind your products.
Trusted By Leading Organizations
Food, dairy and beverage producers carry some of the most energy-intensive processes in industry, alongside complex supply chains and growing scrutiny from retailers and consumers.
We find the savings hiding in thermal systems and refrigeration,
then build phased roadmaps that fund themselves through savings, grants and rebates.
With a large, complex value chain, the client needed clarity on their full Scope 1, 2 and 3 impacts and a clear reduction strategy that could evolve year on year.
Annual carbon footprint assessments and a full Scope 3 and ESG strategy through the FAST framework.
A climate action roadmap identifying 2,607 tCO2e of potential savings across Scopes 1, 2 and 3.
ISO 50001 Energy Management System established in 2024, managed by Climeaction.
B Corp readiness, community and employee engagement plans, and sustainable procurement programme.
The site runs large proofing and baking ovens, a major frozen warehouse refrigeration system, HVAC and general plant heating. Despite investment in metering, there was no clear structure to hit energy reduction targets or identify the next major projects.
FAST programme followed by CAaaS, starting with refrigeration optimisation and improved chiller setpoints.
Reduced natural gas demand in loading bay dehumidification through setpoint challenges and separation technologies.
LPHW heat pump installed to capture refrigeration return heat for existing heating and hot water systems.
Upgraded energy management data processing; compressed air, solar PPA and district heating investigations.
Conventional quick wins were already exhausted after years of boiler optimisation, equipment upgrades and process improvements.
Further reductions demanded a deeper engineering-led approach: compressed air optimisation and electrification of low temperature heat for AHUs, CIP systems and production processes.
Full SI 426 compliant FAST Climate Action Strategy with detailed Scope 1 and 2 analysis across the campus.
24 low and no cost measures across compressed air, wastewater treatment, pumps and motors: an additional 8% campus-wide energy reduction.
Waste heat recovery from new compressors and chillers feeding HVAC and CIP.
Seven major capital projects electrifying low temperature heat, replacing over 11 GWh of annual fuel use.
New solar PV to supply over 51% of one facility’s electricity; dedicated Energy Manager under CAaaS
High thermal demand from steam and hot water across pasteurisation, drying, refrigeration, water treatment and CIP, with ageing utility infrastructure, outdated controls and the need for phased capital investment.
The client needed a roadmap delivering immediate savings while embedding operational excellence.
Phase 1: BMS and control upgrades, steam system optimisation, boiler burner and O2 control, compressed air, EEOS funding and Origin Green support.
Phase 2: redesigned CIP recipes, chilled water sequencing, economiser retrofits and insulation upgrades.
Phase 3: boiler descaling, feedwater treatment, high-efficiency ammonia compressors with VSDs, water reuse.
Phases 4 to 5 (to 2030): ISO 50001, 46001 and 14001, industrial heat pumps, large-scale solar PV and expanded digital metering.
FAQs
Let’s talk
Tell us about your thermal loads, your Scope 3 reporting and what your customers are asking for, and a member of our team will come back to you.
Through a combination of data-driven insights and innovative approaches, we work closely with you to reduce carbon, save energy, and increase profits.
Ireland
11 South Mall
Cork City, T12 CYF7
19 High Street
Kilkenny, R95F2KD
© 2026 Climeaction. All Rights Reserved