Life Sciences |
Sustainable facilities, decarbonized supply chains and net zero commitments for pharma, medtech and medical device leaders. Delivered by engineers, not general consultants.
Trusted By Leading Organizations
Life sciences sites combine 24/7 utilities, strict validation and planning constraints, and ambitious corporate targets that individual facilities are expected to deliver.
We design low-carbon utility systems that respect production continuity, validation and planning constraints, and we build the roadmaps that get them funded.
Rising energy demand across a multi-building site, heavy reliance on steam and gas in the LPHW network, and significant cooling loads from ammonia chillers and open-loop cooling towers. Boilers were near minimum efficiency and could not support growth, strict planning restrictions ruled out new permanent structures, and no medium-voltage supply existed for new equipment.
Energy Efficient Design study in accordance with IS 399:2021, modelling low-carbon heating and cooling pathways.
1.2 MW ammonia heat pump at 85 °C, three 1.2 MW ammonia chillers, two 1.5 MW cooling towers, 40 m³ buffer tank.
Boiler feed pipe relocation improving hydraulics and increasing boiler capacity by 40%.
Three-storey steel structure fabricated offsite to avoid planning constraints and minimise production disruption
Total 2024 site energy of about 80.7 GWh, with around 42 GWh of electricity and strong summer cooling peaks. Market-based Scope 2 was already eliminated through renewable procurement, leaving Scope 1 dominated by natural gas boiler steam across a multi-decade campus of mixed-vintage systems.
FAST opportunity mapping across steam, HVAC, cleanroom air, chilled water and compressed air.
Portfolio of more than 25 decarbonisation opportunities with modelled savings.
Basis of Design for waste heat recovery displacing boiler steam.
ISO-aligned governance with measurement and verification routines
Seven factories and three offices spread across geographies, each producing different products, each at a different maturity level in energy and water management, and each operating to individual standards with no regional approach in place.
FAST Climate Action Strategy delivered in just 12 weeks.
300+ Scope 1 and 2 emissions sources and 250+ Scope 3 sources identified.
Scope 1 and 2 strategy centred on HVAC optimisation with heat pumps, electric boilers and heat recovery.
Scope 3 strategies: sustainable travel, nearshoring raw materials, track and trace for a high-emission raw material.
FAQs
Let’s talk
Tell us about your site, your validated areas and the targets you are working to, and a member of our team will come back to you.
Through a combination of data-driven insights and innovative approaches, we work closely with you to reduce carbon, save energy, and increase profits.
Ireland
11 South Mall
Cork City, T12 CYF7
19 High Street
Kilkenny, R95F2KD
© 2026 Climeaction. All Rights Reserved